When I paste text over several rows, the row after the last one i pasted is often moved within the range. It is not a big problem as the pasting still happens accurately, it’s just strange to have to reorganize my rows after pasting.
Here, I pasted the same text onto rows 186 to 190, but somehow row 191 was moved right before row 188 after my pasting was executed.
It’s a table with a dozen columns of different types, including two links to different Tables, unsorted but indexed against an autonumber column to generate the IDs. The re-ordering after copy pasting has happened several times today, but it does not happen systematically.